The Cabling Group
( Certification )
Overview
Industries
Utilities
The Cabling Group (TCG) install Network Infrastructure to large commercial project principally (but not exclusively) in the City of London. TCG do not manufacture any of the products we install. The products are specified at the design stage of the project. TCG lease office space in EC3 with a stores facility on a farm in Essex. Our main contributing factor to GHG is the fleet of company vehicles which are used by engineers on projects outside of London and also used daily for delivery of materials from the holding warehouse in Essex to the sites in London and beyond.
Contact
Devonshire House, 1 Devonshire Street, London, England, W1W 5DR, United Kingdom
Certification disclosure
The Cabling Group: Summary of Toitū Carbon Reduce Organisation Certification 2024( Achievements )
Certification overview
Toitū Carbon Reduce Organisation
Learn moreToitū Carbon Reduce Organisation certification means committing to ongoing reductions while achieving annual greenhouse gas emissions measurement to ISO 14064-1 2018 standard and Toitū requirements.
Certification Date Issued
06 October 2023
Valid Until
06 October 2026
Certificate Number
2023401J
Certificate Status
Active
Level of Assurance
Reasonable